Registration on each day opens at 08.30am and the first session will commence at 09.00am, with each day ending at 17.00pm
DAY ONE - Monday 19 September 2011
Overview of Wastewater Treatment
- Sources of wastewater
- Chemical composition
- General plant overview
- Link to process
- Legislative drivers: IPPC, Water Framework Directive, EPER
Primary Treatment
- Oil separation, emulsion breaking, solids removal
- API&CPI separators, dissolved air flotation
- Chemical treatment to aid separation
DAY TWO - Tuesday 20 September 2011
Secondary Treatment
- Biological treatment process overview
- Design of treatment layout
- Aeration options
- Microbiology of wastewater treatment
- Filamentous bulking and foaming
- Microscopy as a troubleshooting tool
- Respirometry
Biological Nitrogen Removal
- Nitrification
- Denitrification
- Emerging Technologies
Operational Parameters and Troubleshooting
- Process control
- Control of sludge age
- Loading control
- Mass balancing
- High ammonia in the effluent
- Bulking/floating sludge remediation
DAY THREE - Wednesday 21 September 2011
Tertiary Treatment and Polishing
- Metal removal
- Odour control
- Effluent polishing
- Recycling options
Sludge Dewatering and Disposal
- Sludge thickening
- Oily sludge centrifugation
- Belt and plate & frame presses
Book Now

